1nspecT ships two phase-inspection SoPs for new-construction work: Phase 1 Pre-Pour (foundation before the slab is poured) and Phase 2 Pre-Drywall (framing and rough-in before drywall goes up). Each has its own template, its own rating scale and its own AI narrative framing. Together they cover the two phases most new-build inspectors are hired for.

Phase 1 Pre-Pour

The SoP ID

Pre-Pour in the code is phase_1_pre_pour. The seeded template is named {slug} Phase 1 Pre-Pour, where the prefix is your company slug.

What it covers

Foundation elements that will be concealed by the slab:
  • Formwork (dimensions, alignment, bracing)
  • Reinforcing steel (grade, placement, spacing, cover)
  • Post-tension cables (if applicable)
  • Plumbing rough-in (water, drain, waste, vent)
  • Electrical rough-in (conduit, grounding)
  • Vapor barrier, insulation
  • Pre-pour conditions (weather, temperature, moisture)

Pricing basis

Pre-Pour services are priced on the foundation footprint, not the home’s living area. Set the pricing basis on the primary service in Pricing Manager (Business Ops › Pricing › Primary Services → the Pre-Pour service → Pricing / duration basis = Foundation footprint). See Primary services.

AI narrative framing

The AI uses pre-construction scope language: references to drawings and plans, soils reports, and the project superintendent. Causation language stays hedged because the slab is in-progress, not finished.

Phase 2 Pre-Drywall

The SoP ID

Pre-Drywall in the code is phase_2_pre_drywall. The seeded template is named {slug} Phase 2 Pre-Drywall, where the prefix is your company slug.

What it covers

Framing and systems that will be concealed by drywall:
  • Framing (floor, wall, roof, headers)
  • Fasteners (shear-wall nailing, hangers, hold-downs)
  • Sheathing (type, nailing pattern, flashing)
  • Rough-in plumbing (venting, slopes, connections)
  • Rough-in electrical (box fill, circuit routing, grounding)
  • Rough-in HVAC (duct routing, sealing, insulation)
  • Insulation (where applicable at this stage)
  • Window and door installations

Pricing basis

Pre-Drywall on a multi-unit building is priced on the building total (all units added together). Pricing Manager handles this: set the pricing basis to Building total (all units) on the Pre-Drywall service.

AI narrative framing

The AI uses in-progress language: things that are correctly in place, things that need correction before drywall, reservations about systems that cannot be fully evaluated at this stage.

Rating scales

Both phase SoPs use rating scales appropriate to in-progress construction (not the TREC resale I / NI / NP / D scale). Open each SoP in SoP Manager and click View Ratings to see the exact scales shipped. Phase SoPs are not locked.

Reinspection

Phase inspections can carry reinspections like any other inspection. The reinspection rating scale for a Pre-Pour or Pre-Drywall reinspection is set on the phase SoP itself. See Reinspection rating scales.

11-month warranty inspection

The 11-month warranty inspection (performed before the builder’s one-year warranty expires) is not a dedicated phase SoP in 1nspecT today. Set it up as a primary service in Pricing Manager that uses either your TREC or InterNACHI template with the Inspection Type set to 11-month warranty. The AI adjusts narrative framing automatically.

Multi-phase orders

One order can carry Pre-Pour, Pre-Drywall, Final and 11-month warranty as separate phases. (The Bundle Agreement Group field on primary services is saved but never read, so it does not bundle agreements today.) See Primary services and The order lifecycle.